After Mr. Adolfo Held checked-in at the hotel on August 15, 2007, a short meeting was conducted with Engr. Christine A. Orbe, Manager of the Iligan City Waterworks System Office (ICWS), at the ICWS Conference Room. Engr. Orbe made a short presentation on the organizational structure of the Office and an overview of the existing water system in Iligan City.
On August 16, 2007, Mr. Held met Archt. Gil R. Balondo, City Planning and Development Coordinator (my boss) and had a short informal discussion. Then Adolfo and I proceeded to ICWS Office to get ready for the scheduled site visit. With us were Engr. Josephus Albao and Leelic Dacoco. We visited the Ditucalan Spring water source, Camague Reservoir, Fuentes Clustering System, Hinaplanon Pumping Stations, and Luinab Reservoir.
Ditucalan Spring Source
Mr. Held said that the Ditucalan Spring source has still enough capacity to supply the existing water consumers. The problem lies in the distribution. It was also observed that the water treatment facility being used is already rusted.
Ditucalan Spring Source with dam
Water Treatment Facility
In photo with me are Engr. Josephus Albao and Adolfo Held







